Solar Park Development
in Argentina
Solar Energy for
Electric Cooperatives
In the pursuit of generating energy from renewable sources, we offer turnkey solutions tailored to each electric cooperative in the country, based on the development of photovoltaic solar installations. With over 60 years of experience in the Argentine electrical market, we have a deep understanding of the challenges faced by cooperatives.
Our solution helps reduce electricity acquisition costs while decreasing dependence on traditional energy suppliers.
Completed Project: CETASA
This project consists of a photovoltaic system developed for the Electric Cooperative of Azul, located in Buenos Aires Province. It enables cooperative members to reduce energy costs and positions CETASA as the first cooperative in Buenos Aires to adopt renewable energy through a photovoltaic system.
- Installation of 180 solar panels.
- Generation capacity of 61.2 kWp.
Solar Energy for Industrial Parks
Both industrial parks in Argentina and the companies operating within them should have the opportunity to generate and consume energy from renewable sources. That is why we have developed a unique and innovative solution in the market, based on photovoltaic solar generation optimized for this type of client.
Completed Project: Centro Chaqueño Industrial Park
This project consists of a photovoltaic solar park developed for the Centro Chaqueño Industrial Park, located in Presidencia Roque Sáenz Peña, Chaco Province.
Pioneers in Renewable Energy: This project positions our client as the first industrial park in the province to enter the renewable energy sector, and one of the first in the country.
- Installation of 350 solar panels.
- Generation capacity of 150 kWp.
Hybrid Solar-Thermal Solutions
A hybrid solar-thermal plant generates electrical energy by combining a photovoltaic solar system (PV) with generator sets (gensets).
Completed Project: SECHEEP
A hybrid solar-thermal plant generates electrical energy by combining a photovoltaic solar system (PV) with generator sets (gensets).
The Hybrid System Consists of:
- A photovoltaic system with an installed capacity of 201.5 kWp.
- Two generator sets totaling 730 kVA.
Description:
- Installation of 620 solar panels.
- Generation capacity of 201 kWp.
Contact Us
If you need more information about our services, please send us an inquiry.
MIRON CONTACT INFORMATION
-
OUR FACTORY
Colectora Norte, Acceso Oeste, Km 54.8, Gral. Rodriguez, Provincia de Buenos Aires.
See Location -
ADMINISTRATIVE OFFICES
De los Reseros 1851, Villa Udaondo, Ituzaingó. Timbre 2i
See Location -
OPERATIONS AND SERVICE CENTER
Gral. Juan Gregorio las Heras 4891, Villa Martelli, Provincia de Buenos Aires
See Location
Development: Urbana espacio creativo